Skip to content

Design for Manufacturing / Injection Point and Mold-Flow

DfM Deep Dive

Injection point and mold-flow: Where the melt enters determines quality and cost

The injection point determines flow direction, weld lines, material orientation, and leaves a visible mark. Where and how the material enters the mold determines weld lines, air entrapment, and dimensional stability. We always verify this with mold-flow analysis before any steel is milled.

You never choose the injection point on a visible area or on a functional sealing surface. Preferably, you inject in or near the thickest zone, so the melt flows from thick to thin and the hold pressure works longest where the shrinkage is the greatest.

Teaching plate injection point and mold-flow: injecting on the visible area leaves a visible mark and weld line, at the edge the weld line remains unobtrusive

What the injection point influences

EffectWhy it matters
Flow directionDetermines whether thin, remote sections still fill well before the melt solidifies
Weld line positionBehind every hole and every core, the flow front meets again; that weld is weaker and sometimes visible
Fiber and shrinkage directionFor glass-filled materials, the injection point determines fiber direction and thus strength anisotropy
Visible markThe injection point itself leaves a trace on the product

Controlling weld lines rather than hoping

The melt follows the thickest path. A locally slightly thicker "flow leader" attracts the front, a thinner zone slows it down. This way, you can shift a weld line by several centimeters without changing the injection point. Residual strength at the weld line for unfilled materials (PP, ABS, PC) is about 80 to 100 percent of the base material; for glass-filled grades such as PA6 GF30 it can drop to 40 to 60 percent, as the fibers do not cross the weld line.

In every DfM review, we indicate the expected weld line positions and check them against load and visibility. If in doubt, we follow up with a mold-flow simulation.

Gate location is closely linked with the parting line and mold construction: see the full DfM pillar or go to parting line and mold construction.

What does this mean for your design?

Calculate your mold and unit price in 2 minutes, or ask our engineers for a DfM check.

500+ manufacturing companies in the Netherlands, Belgium and Germany chose QDP

PhilipsAkzoNobelVan RaamMobilaneVan GelovenDeVi-GroupGIZMO DesignWaste VisionPure ValueHoeflakeSenza TeaPin-LockSparqDamtechProtee UnitedLayherHulshof
Calculate your price